Select depth of shower required and attach 2”x4” support to floor. Solder tempered water supply connection to “Pre-plumbed Threshold” manifold. Attach “Pre-plumbed Threshold” to 2” x 4”.

Install waterproofing membrane and cement backer board. Install ceramic tile or natural stone.

Cut “Protective Cap” with box knife, remove “Test Plug” to reveal thread. Install self-leveling (wedge) washer to sloped sill and complete “Patented Cam” assembly. Attach coiled, flexible body-spray connector to “Patented Cam” assembly.

Lower “Pre-plumbed” column over cam assembly, rotate until column locks and “clicks” into position.

 

 

       
 
© Oben USA Inc. 2006