  Threshold Bases Installation
       12
BA BA
Install PVC drain pipe through sub floor, for (A) & (B) Lay 6mm Tile & Slate/Compressed Sheet over sub set out dimensions off studs refer to Rough-In Guide floor, cut circular clearance hole for LM Flange. Floor
MUST be level
4 5a 4
              O
  IMPORTANT
Gib/Villa Board to be installed prior to base installation
Install Gib/Villa board walls ensuring it is installed down to floor substrate. Dry fit base and mark outline shape on floor
2hrs
Tile and Slate Floor - Apply polyurethane adhesive.
2 hour cure time (Adhesive Kit included)
     67
 Fit SolaireĀ® base and weigh down with adhesive pale filled with water
Apply butyl tapes and waterproof floor and walls as shown
Apply butyl tapes and waterproof floor and walls. Screw the centre drain tile insert component into the LM flange
 28
OBEN tiled shower solutions solaireĀ®
Rough In
Rough In